Tuesday, July 19, 2011

2012-2016 Mayor's Recommended CIP Observations Series #1

The Mayor presented the 2012-2016 Recommended Capital Improvement Plan. I decided to take a look at this recommended plan versus the current 2011-2015 CIP to see where priorities have shifted and where the programmed sales tax funding is going to be spent in the future. Here are some of my observations:
  • The Indoor Aquatics Development project to be located at the Spellerberg Park location received a funding boost in the recommended plan. It went from $814,000 programmed in 2015 to $5.8 million in total funding in the recommended 2016 CIP. Construction is programmed to begin in 2014. It went from a priority ranking of 43 to project priority #2. This project will replace the current Spellerberg Pool with either an indoor or outdoor family aquatic facility. An indoor facility is a high priority for the Park Board. The City of Sioux Falls Recreation Needs Assessment completed in April 2011 showed that 60% of the respondents felt a need for an indoor aquatics facility. The project justification states the Park department will gauge public demand through neighborhood meetings and feedback coming at large.

  • The Indoor Ice Facility Project had $500,000 programmed in 2014. This project has increased to $1.5 million, programmed in plan year 2013 in the mayor's new recommended plan. This project went from priority ranking #38 to priority ranking #7. The Ice Sports Association will obtain a 99 year lease from Sanford Health to build a facility within the Sanford Sports Complex. The programmed sales tax money will be used to purchase equipment with the city maintaining control of the assets. In return, the public will have use of the facility. Does this arrangement mean the city will be on the hook for future equipment needs of this facility? Will this be an ongoing expense for taxpayers? What exactly does public use of the facility mean to the general public?

  • The $500,000 programmed in plan year 2014 in the current CIP for the Indoor Tennis facility has been moved up to program year 2013 in the mayor's recommended CIP. The SF Tennis Association is expected to obtain a 99 year land lease from Sanford Health to build a facility within the Sanford Sports Complex to be built in northeast Sioux Falls.  The $500,000 sales tax money will be used to buy equipment and construct improvements within the facility. The project description says the city will retain ownership of the equipment and improvements constructed in the facility and in return the public can use the facility year round by agreement between the city and the SF Tennis Association. This is kind of a cozy relationship, considering the "first lady" of Sioux Falls is the executive director of the SF Tennis Association. Does this also mean that the city will be on the hook for all equipment, now and in the future? What about those construction improvements? What kind of improvements are we talking about here? What exactly does public use mean? Is that free use by the public. I doubt it. I doubt this will be a one time cost to the city but more likely an ongoing expense. Questions should abound regarding this use of sales tax dollars from the city council regarding this project.  This project was ranked priority #37 in the current plan and is priority #6 in the recommended plan.
The Indoor Aquatics Development CIP project is very different from the Indoor Ice Facility CIP project and the Indoor Tennis Facility CIP project in that the Indoor Aquatics project is directly in line with the parks and recreation aquatics plans throughout the city. Spellerberg Pool is the oldest pool in the city and is in need of replacement. It is appropriate to look at both indoor and outdoor development possibilities. Aquatics is a program service funded by sales tax to the general public as evidenced by Laurel Oaks Pool, Terrace Park, Drakes Springs, Frank Olson, Pioneer Spray Park, etc.

The ice faclility project and the indoor tennis facility project are very different, however. Both of these projects are spearheaded by associations. I understand public/private partnerships. However, these two associations provide sports activities to a very specific group of people, not to the general public as a whole. A one time public support of taxpayer funds is one thing, but should the taxpayers be on the hook for equipment needs and construction improvements to their facilities indefinitely into the future to support these two facilities? There should be serious questions asked and answers given regarding these two projects before the city council approves any public/private partnership money for this two private endeavors.


                















      Monday, July 18, 2011

      Debt

      It is hard to listen to all the political rhetoric coming out of Washington DC these days. Congress has been on a spending spree since they found out they had a huge budget surplus over a decade ago.

      Washington has spent money on two wars, financed huge tax cuts and expanded Medicare. They didn't worry about deficit spending back then. They didn't worry that they were putting debt on our children and grandchildren.  Everybody wants the services government provides yet nobody wants to deal with how to pay for those services.

      The money has been spent and the debt ceiling must be raised to cover the debt. Yet, here they are in Washington arguing about it at the final hour.  I am sick to death of a Congress made up of grandstanding politicians who are constantly pandering to their base instead of really carrying about the American people - all the American people, not just the people of their own party.

      There are hard decisions to be made to get this deficit under control. It didn't happen yesterday. It has been years and years of spending by the very people who are now vilifying the party they love to hate, whichever party they are not a member. 

      The current state of politics is going to ruin this country. This notion of my way or the highway is destructive. Michelle Bachman wants to vote no on increasing the debt ceiling. What planet are these people on. She comes from the state of Minnesota who has done that very thing. Minnesota used to be a progressive state and look where it is today.  Shut down, closed doors, barricaded buildings and roads.  It is a sad commentary on the failed government of Minnesota and its leaders who can't or won't solve the problem. Former Govenor Pawlenty left Minnesota with a huge deficit and now he wants to be the leader of his party to run our nation.

      Pass the debt limit and then get serious and solve this problem. People in Washington live lives that don't resemble the life the rest of us must face each and every day.  Is that too much to ask our representatives in Congress to pay their bills. It sure seems like it is.

      River Greenway Project

      There has been kind of an evolution regarding the River Greenway project over the last 3 capital improvement programs. The CIP River Greenway Project  incorporates the vision outlined in the 2004 Greenway & Riverfront Master Plan.  

      This Master Plan is an interesting read and clearly set out a greenway vision for the entire city back in 2004. The plan broke out various zones, with the Downtown Riverfront identified as Zone 1. Two concepts were identified, with Concept A including an event center, along with retail and hotel/residential uses. Concept B identified uses without an event center.

      Two public open houses were held and the top ten list of uses were identified for Zone 1:
      • Riverside Dining
      • Pedestrian River Crossings
      • Amphitheater
      • Downtown Riverwalk
      • Integrated Sculpture
      • Attractive Bridge Treatment
      • Outdoor Market
      • Bike Trails
      • Entertainment Arena
      • Urban River

      It is interesting to take a look at this project and the project description in the past three capital improvement programs. Below is the project information copied directly from the the last three 5 year CIP plans:

       
      10/07/09 CAPITAL IMPROVEMENT PROGRAM 2010 - 2014

      CITY PROJECT NUMBER: 189064 DEPARTMENT: 64- PARK/RECREATION
      DEPARTMENT PROJECT PRIORITY: 3
      PROJECT DESCRIPTION:
      DEMO EXISTING RR BRIDGE AND BUILD PEDESTRIAN BRIDGE OVER BSR, GREENWAY
      IMPROVEMENTS, DESIGN & CONSTRUCT (10); STATION POINT, DESIGN (10,12)
      CONSTRUCTION (10,12) OF=DONATED FUNDS
      TOTAL 5 YEAR PROJECT COST: $2,584,480
      PROJECT TITLE: RIVER GREENWAY IMPROVEMENTS
      PROJECT JUSTIFICATION AND RELATIONSHIP TO OTHER PROJECTS:
      The City Council approved a resolution that allowed the Mayor to enter into an agreement with Zip City Partners LLC that gives the City an option to purchase property on the old Zip Feed Mill site for the construction of an events center. As a consideration, the City agreed to make improvements on City owned property adjacent to the Zip City Partners property and construct a pedestrian bridge connecting the east and west banks of the Big Sioux River. This project follows the conditions of the agreement and encorporates the visions of the adopted Sioux Falls Greenway and Riverfront Master Plan. The master plan also identified a need for shaded rest areas along the recreational trail. These station points would also provide way finding information, mile markers, drinking fountains, and related amenities.

       ($2.1 million in engineering and construction costs funded by bond funds was programmed in 2010, along with $49,680 in sales tax funds for engineering and construction costs.)


      6/25/10 CAPITAL IMPROVEMENT PROGRAM 2011 - 2015
      CITY PROJECT NUMBER: 189064 DEPARTMENT: 64- PARK/RECREATION
      DEPARTMENT PROJECT PRIORITY: 36
      PROJECT DESCRIPTION:
      GREENWAY IMPROVEMENTS, FALLS PARK TO 6TH STREET, DESIGN & CONSTRUCT (11);
      STATION POINT, DESIGN & CONSTRUCT (14) OF = BIG SIOUX ENVIRONMENTAL FUND (11)
      OF = DONATIONS (14)
      TOTAL 5 YEAR PROJECT COST: $1,908,936
      PROJECT TITLE: RIVER GREENWAY IMPROVEMENTS
      PROJECT JUSTIFICATION AND RELATIONSHIP TO OTHER PROJECTS:
      The adopted Sioux Falls Greenway and Riverfront Master Plan outlined
      improvements the public wanted to see along the Big Sioux River Greenway. This project will construct those improvements on the east bank of the Big Sioux River from Falls Park to 6th Street. These improvements consist of seat walls, a bump out into the River, widening the bike trail, lighting, ramps down into the greenway from 6th Street and various landscape improvements. These improvements will clean up the greenway corridor, provide better access to the river, and use the river as an amenity to draw people downtown. This project will use the Big Sioux Environmental Fund to fund construction. The master plan also identified a need for shaded rest areas along the recreational trail. These station points would also provide way finding information, mile markers, drinking fountains, and related amenities.


      ($1.8 million funded with "other financing" was programmed for 2011 and $43,560 was programmed in 2014 using "other financing" and sales tax funds.)


      6/22/11 CAPITAL IMPROVEMENT PROGRAM 2012 - 2016
      CITY PROJECT NUMBER: 189064 DEPARTMENT: 64- PARK/RECREATION
      DEPARTMENT PROJECT PRIORITY: 1
      PROJECT DESCRIPTION:
      GREENWAY IMPROVEMENTS, 8TH STREET TO 10TH STREET PHASE 2a, CONSTRUCT (12)
      TOTAL 5 YEAR PROJECT COST: $1,064,260
      PROJECT TITLE: RIVER GREENWAY IMPROVEMENTS
      PROJECT JUSTIFICATION AND RELATIONSHIP TO OTHER PROJECTS:
      The adopted Sioux Falls Greenway and Riverfront Master Plan outlined
      improvements the public wanted to see along the Big Sioux River Greenway.
      Phase 2a will begin construction from 8th Street south to approximately the
      River Ramp. Improvements will consist of concrete river walls, stepped edges
      into the river, accessible ramps from 8th Street and the railroad bridge, the
      possible replacement of the exisiting railroad bridge, widened bike trails,
      lighting and landscaping improvements. These improvements will clean up the
      downtown greenway corridor, improve water quality, provide better access to
      the river, and use the river as an ammenity to draw people downtown. The
      river greenway improvements project has spurred private redevelopment
      downtown, and will continue to do so in the future. A downtown TIF is being
      evaluated and may provide funding to supplement the city's sales tax
      investment in the greenway. If TIF becomes available, the department will
      look to amend the CIP and continue the greenway improvements along the CNA
      Surety redevelopment site and other redevelopments as applicable.

      (The only money programmed for this project is in plan year 2012 and the $1,064,260 is for construction using sales tax.)


      Master plans are important to the future vision of any city. They become living documents, a road map, for city and elected officials. It appears elected officials and city officials don't refer back to adopted master plans as they set their own agendas.

      City officials change; elected officials rotate in and out every four to eight years. Continuity in planned vision is supposed to happen with master plans but who knows if that actually occurs when elected officials come in with their own pre-conceived notions regarding their "vision" for a city.

      2004 was a long time ago and things evolve, no doubt about it.  Funding of this project seems to be evolving plan year to plan year.You be the judge on where you think this project is going and if this project is being completed as envisioned back in 2004.



      Monday, July 11, 2011

      Rail Yard Relocation Update and Possible Impact to Southeast Sioux Falls

      A quarterly update was presented to the City Council on July 5th providing information related to the 2001-2002 Railroad Relocation Master Plan. The master plan was divided into 4 phases. It is nice to hear that Phase I of the plan is done. It had 3 major projects:
      • Benson Road Siding - Completed
      • Phillips Ave. Extension - Completed
      • Paisley Park Underpass - Completed
      Phases II and III are in progress and Phase IV is ongoing. Phase II consists of a new rail switch yard and construction to replace tracks in the downtown area. Phase III is also related to the rail construction replacement in Downtown and new construction of the main line.

      Phase IV is working on an agreement between Burlington Northern and the city regarding eliminating grade crossings throughout Sioux Falls. In 2008 the 57th Street grade crossing was eliminated with the construction of a bridge over 57th Street. The 69th Street Bridge will be completed in August 2011. This phase will look at potential future crossings throughout the city.

      The meat of the Master Plan, however, is Phases II and III dealing with the downtown rail relocation. It appears the sticking point in this project is the environmental assessment. The Feds appropriated $40 million for this project in 2006 and there is something like $38 million remaining in the allocation. This money is not sitting in a city account. The money remains with the Feds through the FHA who will authorize the release of the funds when the city signs a contract related to the project. 

      Councilor Jamison asked if this was a city project and the reply was yes with reservation. It was stated that the Environmental Assessment is the key to getting the federal dollars. If this was purely a city project funded with city funds, there would be no need to do the EA.

      City staff is currently working on the Environmental Assessment which entails multiple design meetings to identify feasible alternatives and meetings with the major stakeholders. It is taking a long time to make progress on the Environmental Assessment.

      It is also taking a long time to determine what sites are feasible so the EA can get rolling. The past sites identified as feasible were:
      • Rice Street Corridor between Sioux Falls and Brandon
      • Ellis & Eastern Mainline yard
      • Downtown Y connector alternative for NE and NW lines - 2nd bridge across the river in Falls Park
      • Modification of the existing bridge across the river in Falls Park (this alternative has since been crossed off the list because it is no longer a feasible option.)
      The city added a new alternative in this update - the Canton Line in Southeast Sioux Falls. They said the reason for adding this alternative as feasible is because of the 57th Street Bridge and the new bridge currently being constructed across 69th Street. 

      Councilors expressed some concerns/questions regarding this new alternative. I was glad to hear their concerns considering the city is thinking about moving the main switching line to the residential southeast area of Sioux Falls which is a growing residential area.

      If you live in the central or southeast part of Sioux Falls, then you are familiar with the trains that travel the Canton line into Sioux Falls. These trains travel this line at all times of the day and night but they especially create havoc when they move through town around 7:30 or 8 a.m. or close to quitting time at work. It's nice that there is bridge over 57th Street but those trains have to travel over the 49th Street grade crossing, the 26th Street grade crossing, the 14th Street grade crossing and the Cliff Ave. grade crossing on it's way to the downtown rail yard at 8th Street. The traffic disruption when those street crossings are cut off is atrocious and has a major impact on the eastside.

      A switch yard on the Canton line in southeast Sioux Falls would now mean the train traffic will double what it is today.  Instead of switching in downtown as they do today, the trains from all the quadrants would have to travel through the central and southeast part of town out to the new Canton switching line and then travel back to where they want to go.

      When trains now travel the Canton line through southeast and central Sioux Falls over those grade crossings, the trains cut off all traffic in that entire corridor. How is that progress? How is that an improvement? The impact to the quality of life in southeast Sioux Falls will decrease with this alternative site. Now the residents in that area of Sioux Falls will hear double the train noise and horn tooting anytime day and night. What are they thinking? They said the reason for this new alternative is to minimize the falls area and cost.

      Cost, that pesky factor in anything the city does these days. Evidently there is not enough federal money for the bridge allocation in the falls park alternative. There might be barely enough money for the siding option but the fact is the city could have to provide additional dollars to the federal allocation to get this project completed. That means 2nd penny tax dollars in the capital program or bonding.

      That might explain the new alternative using the Canton line as a solution, sacrificing the quality of life for the southeastern section of the city. Quicker and cheaper, affordable and prudent -  that may be the continuing line down at City Hall. Forget the fact that a huge residential part of the city will have to sacrificed for this progress. It was said that the Ellis & Eastern Mainline yard was already determined as feasible. So why are we considering the new Canton line as an alternative if there is already a feasible site?

      The timeline was set out as follows:
      • Over the next 90 days, city staff should be able to finalize the design work.
      • The next update is October 3.
      • Two public meetings will be held in November 2011 and May 2012.
      • The draft EA will be ready by January 2012 with the final review and approval by September 2012.
      • Construction in 2012-2014
      People need to start paying attention to this project. More rumbling trains, tooting horns and major traffic delays may be in your distant future if you live in southeast Sioux Falls and the surrounding area. 

      Saturday, July 9, 2011

      Whose Parade and Picnic Is It?

      The sixth annual Mayor’s Fourth of July Family Parade and Picnic at Falls Park was held last week-end. It's a nice event for the community started by former Mayor Dave Munson to celebrate the birth of our nation with the citizens of Sioux Falls. People are treated to free food and entertainment. This year's annual national birthday event was billed as Mayor Huether's 4th of July Parade and Picnic.

      This artwork was on the T-shirts worn by volunteers at this year's 4th of July Parade and Picnic.

      I wouldn't necessarily have commented on this but people have mentioned it to me and asked why he would name the parade and picnic specifically after himself.  The moniker "mayor" is the name of the office, not a person. I suppose there are people out there who don't know who the mayor of Sioux Falls is so he needed to let people know that it was "his" parade and "his" picnic.

      Thursday, July 7, 2011

      Plan B Perspective

      South Dakota Straight Talk has an interesting take on the Event Center debate and Plan B.

      Check it out at:http://www.sdstraighttalk.com/

      Wednesday, July 6, 2011

      There's a New Group In Town With a Similar Name

      Today, Build It Now SiouxFalls held their first press conference to announce a grassroots campaign to convince voters to support building an event center at the Arena/Convention Center location. The organization's objective is to specifically get the vote out this November.

      The co-chairs of this grassroots organization are:

      Alan Amdahl
      President of the Home Builders Association of the Sioux Empire
      Owner of Amdahl Construction

      Nicki Ellerbroek
      Owner of McNally’s Traditional Irish Pub

      Dr. Dave Kapaska, Regional President
      Avera McKennan Hospital

      Tom Kelley
      President of Gage Brothers Concrete

      Dr. Charles Pat O’Brien, President – Sanford USD Medical Center
      Sanford Health

      Mike Sullivan
      Executive Director of the Sioux Falls Sports Authority

      It is an impressive group of co-chairs, especially the representatives from the two health systems in town. The press conference was lead by Mike Sullivan who stated it would be run like a political campaign. He stated he had just flown in from Florida last night.

      Sullivan said they were not affiliated with the mayor or city council. Yet, I am told Rolfing, Entenman (standing with a Build It Now Sioux Falls sign) and the mayor all stood in the back smiling and happy.

      Sullivan, when asked by the media to name the top 3 benefits of "building it now" at the arena/convention site,  stated the top reason was the economic impact on Sioux Falls and that Sioux Falls needed to keep up with other cities in the region. Kelley from Gage Brothers had to actually fill in the third benefit for him which was to build it for the younger generation.

      All co-chairs spoke and all had a central theme - those darn pesky tail lights going down the interstate to Sioux City or Omaha or up the interstate to Fargo. Sullivan said if we build a quality place, get quality events, then they will be there. He stated Sioux Falls has always been the leader of South Dakota; that he wasn't just talking about Sioux Falls but talking about all of South Dakota.

      He said the economic boom is going to come to Sioux Falls. People are going to spend the night here, go to restaurants, go to the bars, gas stations and stop at convenience stores. Well, I submit to you that the visitors from outside Sioux Falls, not the ones who will drive in and drive out, but the ones who might just stay, will have to travel a bit to get to some of those amenities. Let's not forget that the mayor has said that he is building it for the 60% who are from out of town - the very people who want to drive in and drive out easily. Maybe it should be titled The In and Out Event Center.

      The last time I read the AECOM Economic Report, the economic boom at the Arena/Convention Center location was dismal in comparison to the economic boom of the Downtown Cherapa Site. But hey, why confuse anyone with the facts, right?

      It's all about building it fast! Sullivan said so - so did Amdahl and Kelley. Amdahl and Kelley rang the alarm bell on the increasing construction costs if we don't get this done fast. Sullivan introduced Alan Amdahl as Adam Amdahl which Mr. Amdahl had to correct when he got to the podium. Here we have a seeminly close knit group who didn't really seem to be working as a cohesive group at this their first press conference. Also, it might help if the co-chairs knew the name of their own group. It's not Build It Sioux Falls.....it's Build it Now Sioux Falls. 

      Amdahl stated that it is the opportune time to build the event center because the interest money is cheap and affordable. He stated we need to vote now, not in April 2012 or November 2012.  Material costs are going up 6% per year and over 5 years from now costs will go up $30 million. He said we need to push for a November 2011 election and build it as soon as possible.

      Kelley says the city is not sacrificing anything. He reiterated the increasing construction costs as the reason to vote now and build quickly. He said all boats rise in a high tide. He seemed to be the finance guy of the co-chairs. He said they will get the true facts out.

      Maybe, they should start with their website since the website's Project Funding section does not match the mayor's financial presentation for building the event center presented to the city council:

      • The website states the City will provide the down payment. No, the fact is the City intends to bond the entire construction cost of the project. 
      • The site says private funding will also be raised, through naming rights, sponsorships and donations. That is actually the plan if they hire Superlative or some other sales/marketing group.
      • The site says the City of Sioux Falls estimates this to be between 15 and 25 percent. Well, that estimate pertained to the mayor's originial funding idea which was going to be used for the down payment. Now the naming rights, sponsorships and donations will be used to fund the annual operating costs of the event center so as not to put a subsidy drain on the city's future operating budget.
      Sandford USD Medical Center's Dr. O'Brien stated that Sandford Health brings in hundreds of people to their facilities and they tell people what a wonderful community Sioux Falls is and what the city has to offer. Yes, both medical facilities are ambassadors in the community and we have much to be proud of when it comes to both Sandford Health and Avera McKennan. But really, these people who come to Sioux Falls through the hospitals/clinics are here because they have a loved one who is seriously ill. Sure they may fill up the hotels around town, but just how much shopping, event going and bar hopping are these people really doing. I can tell you that when my mother was being treated for cancer in Minneapolis, my family members spent every waking moment at the hospital with her to finally drop in bed at night and get up and sit by her side again the next day. Bar hopping, going to restaurants and going to events were the last thing on our minds.

      Nicki Ellerbroek basically said what the others said about building it now, what an economic boom to the community, etc. etc. etc. She did admit she was eight miles away from the Arena/Convention Center. I am wondering how all those out of towners are going to find her bar way out on the southeast side of town at 69th and Western. We did learn, however, that her Irish Pub was Sullivan's favorite place when he was in town.

      I looked at the list of business supporters to date on the organization's website . A lot of the businesses listed are owned by one person. I suppose listing the businesses separately makes it look like the business supporters are bigger than what it actually represents. They've got Sanford and Avera, but other big name and family owned businesses in this community are missing.

      To be fair, it is the beginning of the grassroots campaign to get it built in a hurry. What I would really like to see is a clear sign of support by these co-chairs and their businesses to pony up some significant part of the $26.2 -$48.3 million related to the Event Center title sponsorship, premium sponsorships and luxury suites based on a 20 year cycle.

      Then maybe their grass roots support of getting out the voters and building it in a hurry at an area that AECOM even said was beat economically by the Cherapa site might help me understand their position to push to build in an area that has no successful economic past.

      Isn't it funny too, that they couldn't come up with a more original name for their grass roots campaign. Build It Now Sioux Falls sounds a lot like Build it Downtown. But hey, let's not confuse the voters, it's all about getting the facts out and getting it done in a big hurry.